Abergavenny Police Station
Supporting community policing in Abergavenny
With growing market appetite for energy efficient, low carbon property, our skill-sets and track-record for energy efficient property are matched by few other companies.
Our latest low carbon milestone was completing the UK’s largest first Passivhaus 'Plus' carbon positive School at Hackbridge Primary School in 2019 while we are responsible for Bristol’s first BREEAM Outstanding 2014 project, Cubex’s Aurora Office Development at its Finzels Reach development.
We have a major track-record in BREEAM Outstanding projects , including a new HQ for WWF and new home for the Met Office’s super-computer in Exeter.
Our expertise for low carbon properties includes working with the Low Carbon Workplace to deliver a series of low energy offices in London, while our Interiors company achieved a BREEAM milestone when it delivered No 4 The Square, Stockley Park; the first non-domestic refurbishment and fit-out to achieve the 2014 BREEAM Excellent rating.
Also, Keynsham Civic Centre has one of the best energy efficiency records for a civic building, being EPC A rated and it achieved the title of ‘Best of the Best’ at the 2015 British Council of Offices awards.
Other projects include:
Download our 'Brilliant Buildings - Delivering Sustainability' publication
Supporting community policing in Abergavenny
Extends Willmott Dixon’s track record of projects for the emergency services across the UK
New home for three GP practices, a base for Chiswick PCN to deliver primary care services to over 60,000 patients and key worker housing
One of the world's most advanced, energy efficient Passivhaus leisure centres
Delivering a state-of-the-art net-zero carbon retirement living village
Birmingham’s biggest office fit-out and refurbishment scheme at 10 Brindleyplace
Adding to our ultra-sustainable portfolio with a net zero carbon in operation academy in Preston
Building an environmentally conscious facility for the community
Building the first net-zero school in Leicestershire
Facility designed to boost local agricultural industry.
Creating a 100% electric and zero carbon 110,000 sq ft workspace in an iconic London location.
Delivering a school upgrade incorporating a wide range of energy efficient methodologies.
Creating a world-leading research centre in North London, winner of the 2021 Construction News Awards 'Project of the Year (over £50m)'.
New sport and leisure facility for Winchester with 50 metre swimming pool
Further 1,200 square metres of industrial and collaboration space to support Somerset's green growth hub
Creating the UK's first Passivhaus ‘plus’ net carbon positive school.
Creating an exemplar eco-school for Hampshire
Delivering a second BREEAM Outstanding office in Bristol, following Aurora
Westminster's flagship development is bringing affordable homes to the heart of Paddington
Creating the UK's first nhow hotel
Mies and Stirling Prize winner Town House is the university's centrepiece.
New multi-level site will provide community spaces and state-of-the-art sports facilities in Croydon
New cutting-edge technical facility for Bournemouth University
Creating a stunning space for digital and creative businesses in Lancashire
The largest Passivhaus secondary school in the UK.
Creating Pembrokeshire’s first Welsh medium through school
New home for school of economics inside the Kennedy building
A modern office space boosting the local economy in Shoreham
Bristol’s first commercial office space to be BREEAM 'Outstanding'
Flagship business school to support the University’s ambitious vision
A Sunesis Keynes school at the heart of a new community
Creating the first undergraduate School of Medicine in Essex
Willmott Dixon delivers Rotherham's first university
Creating 1,244 new school places in Bedford
A specialist training and business development facility in Huntingdon
Creating a new sustainable school for Cardiff
Hub will spur investment in science and technology industry in West country
Wales’ first science park, located in Anglesey
Hub for 3,000 students featuring more than 650-rooms
One of series of schools in Croydon we are building
Refurbishing one of Birmingham’s most well-known landmarks to create grade A office space
Grammar Annexe for 450 11 to 16 year old pupils with a 180 student sixth form
New centre to celebrate Milton Keynes history
Cat B fit-out of the new head office for the Department of Health at 39 Victoria Street
New model for student accommodation at Royal Holloway, University of London
One of two colleges we are building to train thousands of HS2 engineers
New sustainable free school for North Devon
Creating modern educational facilities in Milton Keynes
Major leisure investment in Fleet on state-of-the-art facility
Transformation of a 1980s built office block into low carbon workspace for 21st century needs
Tech incubator and life sciences facility for Nottingham
New central hub to make the university a world leader
University of Warwick’s flagship central teaching facility
135,000 sq ft of Grade A BREEAM Excellent office space that's phase one of Central Square, a 1 million square foot development in Cardiff Enterprise Zone
Housing the final part of Met Office's new supercomputer
The first of two next generation custody suites we've built for West Midlands Police
Replacing Wilderness School with new Free School for 600 pupils 11 - 16 year old and a further 190 at sixth form
Iconic new library for the University of Bedfordshire
New leisure centre set to rejuvenate sporting facilities in local area
Britain’s first state secondary school to be based in a university
Creating the UK's largest space research and development facility
Iconic, zinc-clad university building, with BIM used for design and construction
Refurb of seven storey, Grade II listed office to provide 70,000 sq ft of new offices to Cat A standard
1,200 pupil secondary school for Denbighshire County Council
We delivered a cat B fit-out to create the new HQ for HS2
Largest non-residential building to achieve coveted ultra low energy consumption Passivhaus standard
New hotel in the heart of Beverley as part of the Flemingate development
Second Sunesis school for Plymouth - built in 39 weeks!
Hi-tech university building, delivered with detailed planning using BIM Level 2
Willmott Dixon's third Liverpool secondary school in as many years, built with local labour and suppliers
Our higher education skills are supporting Wiltshire College's ambitious expansion plans by building a state-of-the-art campus hub adjacent to its former campus.
New 3 form entry primary school with 39 place nursery provision,
Complex refurbishment of a 10-storey office block, which remained operational throughout
Theatre, digital media centre and laboratories built to BREEAM Excellent within a live campus site
Doncaster's first new school in a generation; it used a Sunesis standardised design to deliver in 9 months
Extension to further education college in town centre location, built to BREEAM 'Excellent'.
The Barn is the latest development at the University of Nottingham's Sutton Bonington campus
170 home retirement village for Anchor Trust in the heart of Hamphire
Low carbon workplace refurbishment with cutting edge environmental performance
The UK's first zero carbon 'in use' school
University of Cambridge’s first primary school
BREEAM Excellent university refurbishment delivered on a live campus
Eco-friendly student centre with ground-source heat pumps, photovoltaics and green roof
One of the new wave of UTCs, built on the site of the University of Bolton
Redevelopment of a special needs school in North Wales, delivered on a live site
Leisure centre on former steelworks site, built to BREEAM Excellent rating
Landmark university building in Birmingham city centre, housing the institute of art and design
Construction of a world class, acoustically excellent concert venue
Grade II listed interior refurbishment with new teaching areas, lecture theatres and glazed pavillion
4,000 sq m extension to Darlington Town Hall on constrained urban site
Major regeneration scheme including shops, library, offices and public space
First non-domestic refurbishment and fit-out to achieve 2014 BREEAM Excellent rating
Four-star hotel built on a constrained site next to the M4 in west London
Converting a Grade II-listed building into a new police HQ on a constrained city centre site
The World Wildlife Fund chose us to built its BREEAM outstanding headquarters in Woking
Construction of a new primary school on a constrained site, achieving a BREEAM Excellent rating
New-build high school, built to minimise noise pollution from nearby A48, and delivered to BREEAM Excellent
Refurbishment and extension of a primary school, achieving a BREEAM Excellent rating
Refurbishment and fit-out to create ultra low carbon building in Hammersmith
London 2012 Olympics polyclinic reconfigured into a community health centre for legacy use
Headquarters for Cardiff's transport services, delivered to BREEAM 'Very Good'
Unusual development of health centre and school on same site, with shared services cutting costs for both facilities
Eco-friendly new-build care facility with extensive use of on-site renewables
Community health centre with award-winning design and numerous eco features
State-of-the-art learning environment incorporating sports, science and health specialisms
New build, 1650 place secondary school that includes a 300 place sixth form
UK's first healthcare building to achieve BREEAM Outstanding – a new benchmark in sustainable healthcare
Unique design incorporating professional training and leisure facilities